Printed from CheckTick DSPT Compliance Documentation
Incident & Near-Miss Log (2025-2026)
Owner: Dr Serena Haywood (SIRO) Review Frequency: Quarterly
1. Summary Table
| ID | Date | Type | Severity | Description | Action Taken | Status |
|---|---|---|---|---|---|---|
| NM-01 | 21/01/2026 | Near-Miss | Low | Automated scan detected an outdated dependency (axe-core). | Updated axe-core 4.10.2 β 4.11.0 and merged via PR. | Closed |
Production Incidents to date: 0 Near-Misses to date: 1 (resolved)
2. Detailed Near-Miss Records
Record: NM-01 β Vulnerable Dependency (axe-core)
- Discovery Date: 10/01/2026
- Reporter: GitHub Dependabot (Automated)
- Severity: Low
- Impact: None. Vulnerability identified and resolved by automated process before any exploitation was possible.
- Root Cause: Third-party library released a security patch for a known CVE. Automated monitoring detected the outdated version within the standard scan cycle.
- Corrective Action: CTO merged the patch and updated
pyproject.toml. Updated SRI hash computed and verified. - Verification: CI/CD pipeline passed with zero security vulnerabilities post-merge. Confirmed in Vulnerability & Patch Log.
- Lessons Learned: No process change required. Automated detection and remediation pipeline functioned as designed. Confirms that the zero-exception CI/CD policy is effective at catching dependency vulnerabilities before they reach production.
3. Statement of No Production Incidents
EatYourPeas Ltd confirms that CheckTick has had zero production data security or protection incidents since the platform's launch. This is attributed to:
- Continuous automated vulnerability scanning (pip-audit, Dependabot, CodeQL) blocking vulnerable code from reaching production
- Mandatory MFA on all administrative accounts with no exceptions
- Field-level AES-256-GCM encryption ensuring data is protected at rest
- Network isolation of production infrastructure
This statement is reviewed and confirmed at each quarterly SIRO sign-off below.
4. Quarterly SIRO Sign-off
| Quarter | Incidents | Near-Misses | Notes | Signed |
|---|---|---|---|---|
| Q3 2025 (JulβSep) | 0 | 0 | Platform in pre-launch hardening phase. | Dr Serena Haywood, SIRO |
| Q4 2025 (OctβDec) | 0 | 0 | No incidents or near-misses. | Dr Serena Haywood, SIRO |
| Q1 2026 (JanβMar) | 0 | 1 | NM-01 detected and resolved via auto |